CROCHET Articles 3 min read

Interweave Crochet Corrections 2017

Join us at Maker Festivals Pennsylvania, the ultimate crafting extravaganza in Lancaster from July 31-August 3, 2024, and we will once again be bringing our fiber artists with us! Our festival lineup will have thousands of fiber artists, and jewelry makers!

FALL 2017


Birch Cable Socks

Rnd 3: *FPdc around next 2 sts, esc in next st, FPdc around next 2 sts, esc in next 1 (2, 3, 4, 5) st(s)**, work Rnd 3 of cable patt (see Stitch Guide) across next 15 sts, esc in next 1 (2, 3, 4, 5) st(s); rep from * to ** 1 time, work Rnd 3 of cable patt across next 15 sts, esc in next 1 (2, 3, 4, 5) st(s)—44 (48, 52, 56, 60) sts.

Rnd 5: [Sk next 2 post sts, sk next esc, FPtr around next 2 post sts, esc in skipped esc], working in front of post sts just made, FPtr around 2 skipped post sts, esc in next 1 (2, 3, 4, 5) st(s), work next rnd of cable patt across next 15 sts, esc in next 1 (2, 3, 4, 5) st(s), work bet [ ] 1 time, working behind 2 FPtr just made, FPtr around 2 skipped post sts, esc in next 1 (2, 3, 4, 5) st(s), work next rnd of cable patt across next 15 sts, esc in next 1 (2, 3, 4, 5) st(s)—44 (48, 52, 56, 60) sts.

Rnd 17: [Sk next 2 post sts, sk next esc, FPtr around next 2 post sts, esc in skipped esc], working in front of FPtr just made, FPtr around 2 skipped post sts, esc in next 1 (2, 3, 4, 5) st(s), work next rnd of cable patt across next 15 sts, esc in next 1 (2, 3, 4, 5) st(s), work bet [ ] 1 time, working behind FPtr just made, FPtr around 2 skipped post sts, 2 esc in next st, esc in next 2 (3, 4, 5, 6) sts, work next rnd of cable patt across next 15 sts, esc in next 2 (3, 4, 5, 6) sts, 2 esc in next st—50 (54, 58, 62, 66) sts.


Bristlecone Mitts Notes Add the following: Main body fronts and backs are worked in a cluster pattern. All clusters are worked in the second stitch of the cluster below unless otherwise stated.

MITTS Right Mitt Cuff Rows 3–40 (44, 50): Rep Row 2. Row 41 (45, 51) (join): Hand Size 7″ only Rnd 1: in next ridge end (7 lps on hook), drop lps from hook,

All sizes: Rnd 5: [ch 1, L cross cable (see Stitch Guide, LLcl, join LL] 3 times Rnd 9: [L cross cable, LLcl, join LL] 3 times

Size 6 Rnd 13: [L cross cable, LLcl, join LL] 3 times] Sizes 7 (73/4)” only: Rnd 15: Work as for Rnd 3 across to hdc after single cable, sk hdc after single cable, sk next hdc, hdc across to and into first hdc of next cl, cable. Rnd 16: [L cross cable, LLcl, join LL] 3 times] Rnd 17 (dec): [cable, LLcl, join LL] 3 times, cl across to thumb, 

Left mitt Cuff Work as for right mitt

Hand All sizes: Rnd 2: … 2 times, ch 1, cable, LLcl in next hdc, join LL, Rnd 3: … cable, LLcl in 2nd hdc of same cl, join LL, Rnd 5: [R cross cable (see Stitch Guide, LLcl, join LL] 3 times Rnd 9: [R cross cable, LLcl, join LL]

Size 6 only Rnd 13: [R cross cable, LLcl, join LL]

Sizes 7 (73/4)” only Rnd 13: [R cross cable, LLcl, join LL]


Juniper Cape Stitch Guide Triple Cable Row 10: …FPdc around next post st, dc in same st… CAPE Transition to triple cable Transition row 2: 208 (236) sts;5 sts (incl marked st) bet lg rope and triple cable (12 sts incl 1 hdc each end) Row 1: …work Row 10 of triple cable (see Stitch Guide) over next 12 sts…—208 (236) sts; 5 sts bet lg rope andtriple cable. Row 2 (inc): 222 (252) sts; 6 sts bet lg rope andtriple cable. Row 6 (inc): 236 (268) sts; 7 sts bet lg rope andtriple cable. Back Row 1: …ending last rep at **, hdc in next st…—142 (174) sts. Rows 2-15: …end last rep at **, hdc in last st Rejoin for bottom of cape Row 1: …work next row of lg rope, hdc in next st, ch 3 to bridge arm opening, …ending last rep at **, hdc in next st—236 (268) sts.


Hondius Way Pullover Pattern SHAPE BACK NECK Row 1: 24 (25, 25, 25, 26) dc rem. Row 28 (28, 28, 30, 30): 25 (26, 26, 26, 27) dc. Fasten off. Rejoin front and back Row 1: (WS) Place working lp back on hook, work in patt to end, 4 fdc, dc in first dc of back, pm in dc just made, work in patt across to end of row, turn—24 (25, 25, 25, 26) dc.


Far Out Ruana Add after Left panel: Edging **Turn to work into row-ends of panel, sc bet row-ends across**, *turn to work into free lps of foundation ch, [sl st in next 10 ch, sk next sc] across*, turn to work into row-ends, sc bet row-ends across both panels; rep bet * once; rep bet ** once, turn to work across right panel, sc blo across to last sl st join, sc in sl st joining, turn to work across left panel, sc blo across panel, invisible fasten off (see Stitch Guide).


SUMMER 2017

Jardin Hat Getting Started Notions ADD 1 mm/0.39” diameter invisible cord by Stretch Magic (optional). Pattern Rnd 25: Holding elastic cord behind (optional), sc blo around, working over cord (optional), sl st in first sc to join.


SPRING 2017

Municipal Necklace Upper medallion edging: With RS facing and A Lower medallion edging: With RS facing and A First necklace strap: Rnd 1: With smaller hook and A Second necklace strap: Rnd 1: With smaller hook and A Cosmopolite Bag Cosmopolite Bag: Petal Flower_Revised Unfettered Shrug Getting Started: Finished Size 30 (34, 38, 42, 46, 50)” bust circumference. Sample shown measures 34”, modeled with 0” ease. Notes: Use small hook for sizes 30 (34, 38)” and large hook for sizes 42 (46, 50)”. Pattern: Shrug Panel Edging: Sizes 30 (34, 38)” Sizes 42 (46, 50)” Assembly for sizes 30 (34, 38)” Assembly for sizes 42 (46, 50)” Urban Poncho Modified double crochet three together (mod dc3tog): draw through 4 lps on hook. Modified double crochet five together (mod dc5tog): draw through 6 lps on hook.


WINTER 2017

Pachamama Pillows Pattern Back: Insert “Ch 4, sl st in first ch to form ring.” before Rnd 1. Pachamama Pillow_Revised Chart and Key Whiskers Vest Pattern Back: Row 4: Ch 1, sc across, turn, place marker in 13th (15th, 17th, 19th, 21st, 23rd, 25th) st. Icicle Sweater Pattern Body: Shape Waist: Rnd 12 (inc) stitch counts should read: 12 (12, 14, 14, 16) cl, 7 dc bet cl, 8 (12, 6, 10, 4) dc at each side seair

Join the Conversation!

Choose the membership you’d like to join​

Bead & Jewelry

Annual Charter Membership â€‹

(Limited Time Offer)​

$78.00 $24.95/year

Interweave Knits

Annual Charter Membership â€‹

(Limited Time Offer)​

$78.00 $24.95/year

  • 250+ Projects should be ​ ($2,000+ value)
  • 100 Member exclusive ​ should be ($800+ value)
  • 10,000+ Pieces of Expert Advice (Priceless)​​​
  • To View All Benefits Click Here for Bead+Jewelry or here Interweave Knits

The membership you’d like to join​

Interweave Knits

Annual Charter Membership â€‹

(Limited Time Offer)​

$78.00 $24.95/year

  • 250+ Projects – Fresh for Each Season ($1,400 value)​
  • 100 Member Exclusive Projects ($500 value)​​​
  • 10,000+ Pieces of Expert Advice (Priceless)​​​
  • To View All Benefits Click Here for Bead+Jewelry or here Interweave Knits

The membership you’d like to join​

Bead & Jewelry

Annual Charter Membership â€‹

(Limited Time Offer)​

$78.00 $24.95/year

  • 250+ Projects – Fresh for Each Season ($2,000 value)​
  • 100 Member Exclusive Projects ($800+​ value)​​​
  • 10,000+ Pieces of Expert Advice (Priceless)​​​
  • To View All Benefits Click Here for Bead+Jewelry or here Interweave Knits

The membership you’d like to join​

Interweave Knits

Annual Charter Membership â€‹

(Limited Time Offer)​

$78.00 $24.95/year

  • 250+ Projects – Fresh for Each Season ($1,400 value)​
  • 100 Member Exclusive Projects ($500 value)​​​
  • 10,000+ Pieces of Expert Advice (Priceless)​​​
  • To View All Benefits Click Here for Bead+Jewelry or here Interweave Knits